- Panoramas
 - Van Build
 
					Still Photos
Random collection of colloquial van build photos
					Van 2 Build 0.0 The beginning
Van Build log. December 26th
					Van Build 0.7
April 22nd progress, rear ceiling panels
					Van Build 0.8
May 5th progress, read ceiling panels
					Van Build 0.1
Van Build log. December 31st
					Van Build 0.10
May 13th progress. Done with interior panelling.
					Van2-11
June 10th progress. Done with interior panelling. Bed, bulkhead Done. Loo bench, table, mid pane
					Van2-12
June 18th progress. Cabinets in, Countertops substrate done,
					Summer 2025 95% daylit
Mostly done, daylight view with all natural light
					Summer 2025 95% complete, illuminated
Mostly done, illuminated with interior lighting
					Hangerdeck
View of the Hanger Deck (a.k.a. Cargo Bay, (lets not call it the garage))
					Van Build 0.2
Van Build log. March 08 back from the up fitters and lots of progress
					Van Build 0.3
Van Build log. March 17th, upholstering
					Van Build 0.4
March 31st, stil upholstery
					Van Build 0.5
March 31st. Moar upholstery. Plus wall panels cut and prepped for upholstery
					Van Build 0.6
April 3rd progress, let there be indirect light